  • East West Rail structures

    In 2019 VolkerGround Engineering was awarded a contract by East West Rail (EWR) Alliance (AtkinsRéalis, Laing O’Rourke, Network Rail and VolkerRail), who have been working together to deliver the East West Rail Phase 2 project from Bicester to Bletchley.

    Go to project
    East West Rail structures
  • A585 Lodge Lane Skippool Bridge

    In Summer 2021, VolkerGround Engineering was awarded a programme of works by Kier Highways, to provide temporary steel sheet piling, Continuous Flight Auger (CFA) and rotary bored piling.

    Go to project
    A585 Lodge Lane Skippool Bridge
  • IPort Bridges

    In April 2023, VolkerGround Engineering was contracted by Eurovia Infrastructure Ltd to design and construct Continuous Flight Auger (CFA) bearing piles and a King Post wall. This work was done as part of the wider IPort Bridges scheme, which includes the construction of a 16.2m clear span composite deck bridge, with integral reinforced concrete abutments and wingwalls.

    Go to project
    IPort Bridges
  • Echo Street

    Throughout July and August 2023, VolkerGround Engineering (VGE) completed works on quite an unusual site in Manchester, for Bowmer and Kirkland.

    Go to project
    Echo Street
  • Piling: Lancaster Street

    VolkerGround Engineering has successfully completed a combination of steel sheet piling and Continuous Flight Auger (CFA) piling for WINVIC, in Birmingham, to enable the construction of a 25-storey student accommodation building.

    Go to project
    Piling: Lancaster Street
  • Piling: Lightbody Street

    In October 2022, VolkerGround Engineering was awarded a contract by new client Eric Wright to work with them on Lightbody Street, Liverpool, adjacent to the historic Stanley Dock Complex.

    Go to project
    Piling: Lightbody Street
  • 3 Mills Studios

    In December 2018, VolkerGround Engineering was awarded a contract to provide a combination of steel sheet piling and concrete mini piling, as part of a wider scheme to improve flood defences for the 3 Mills TV and Film Studios in East London.

    Go to project
    3 Mills Studios
  • Lucan place

    In January 2021, VolkerGround Engineering was awarded a contract by Deconstruct UK, to design and construct bearing piles and a secant wall, to assist them in the redevelopment of a former Chelsea Police station, within the London Borough of Kensington and Chelsea, into a seven-storey residential led mixed use development.

    Go to project
    Lucan place
  • Birley Fields

    In July 2019, VolkerGround Engineering was awarded a contract by Kier Construction, for the installation of Continuous Flight Auger (CFA) piles at Birley Fields. The piles will enable the construction of a new student accommodation building at Manchester Metropolitan University.

    Go to project
    Birley Fields
  • Horwich (Bolton Parklands)

    VolkerGround Engineering was contracted by SCC Design & Build Ltd. to install bearing piles for the development of a multi-story car park in Horwich, Greater Manchester.

    Go to project
    Horwich (Bolton Parklands)
  • M20 J3-J5 SMART Motorways

    In October 2018, VolkerGround Engineering was awarded a £3m contract by Kier Highways Ltd to install bearing piles for the motorway signage on the M20, as part of the SMART Motorways programme.

    Go to project
    M20 J3-J5 SMART Motorways
  • Newcastle University

    VolkerGround Engineering was contracted by Bowmer & Kirkland Ltd to install Continuous Flight Auger (CFA) piles, with a contract value of £230,000.

    Go to project
    Newcastle University
  • Milton Keynes

    VolkerGround Engineering was employed by VolkerFitzpatrick to work on the Milton Keynes Gallagher Logistics Park project. The team installed a king post wall with pre-cast concrete infill panels.

    Go to project
    Milton Keynes
  • M4 Junction 12-13

    As part of a £0.33m sub-contract, VolkerGround Engineering was employed by VolkerLaser to install Continuous Flight Auger (CFA) piles to provide the foundations for a crashbarrier on the M4 motorway.

    Go to project
    M4 Junction 12-13
  • Luton Airport DART

    In 2018, VolkerFitzpatrick began a joint venture with Kier to undertake the Luton DART project in Bedfordshire.

    Go to project
    Luton Airport DART
  • M6 J16-19

    VolkerGround Engineering was employed by Kier Infrastructure & Overseas to work on the M6 J1619 project. Using a PVE55 CFA rig, the team installed 750mm diameter Continuous Flight Auger (CFA) piles to a depth of 22 metres.

    Go to project
    M6 J16-19
  • Essoldo House

    VolkerGround Engineering was awarded a £300,000 contract to work on the Essoldo House development located on King’s Road, London.

    Go to project
    Essoldo House
  • Stockton

    VolkerGround Engineering has completed a project for Bowmer & Kirkland, installing Continuous Flight Auger (CFA) bearing piles and a sheet pile retaining wall at a new Hampton by Hilton hotel in Stockton-on-Tees. The works were completed using a PVE 55 and ABI TM 13/16 leader rig.

    Go to project
    Stockton
  • Stratford S9

    In 2017, as part of a larger contract between VolkerFitzpatrick and LendLease, VolkerGround Engineering completed Continuous Flight Auger (CFA) piling works for the Stratford IQL plot S9.

    Go to project
    Stratford S9
  • High Street Lincoln

    VolkerGround Engineering was contracted by Marcus Worthington & Co Ltd. to work on the development of an accommodation block for students at the University of Lincoln.

    Go to project
    High Street Lincoln