
VolkerGround Engineering returns to site to support major infrastructure project
VolkerGround Engineering has recently remobilised to site to support our valued client on a significant infrastructure project.

Our first visit, over two months ago, involved the successful installation of a temporary cofferdam and support frame.
Designed in-house by our expert engineering team, the temporary works solution was tailored to deliver maximum efficiency and cost-effectiveness. Leveraging our extensive stock of over 1,500 tonnes of sheet piles, we deployed 68 GU21 piles at 9 metres in length—resulting in notable programme savings and a reduction in carbon.
For any piling requirements, please contact info@volkergroundengineering.co.uk