Completed in April 2003, this project was located adjacent to the Tower of London. The contract was a design and development, bespoke contract which comprised of hydrotech waterproofing, concrete works and water features. 8,500m2 of York stone paving were laid plus Zimbabwe granite cladding all to very high tolerances to incorporate the water feature and lighting boxes.