Tesco commissioned VolkerFitzpatrick to complete a 442,633ft² single stage design and build refrigerated distribution facility in Dagenham.
Tesco commissioned VolkerFitzpatrick to complete a 442,633ft² single stage design and build refrigerated distribution facility in Dagenham.
The facility, which took 70 weeks to complete, comprises of a ground floor entrance pod, goods in and goods out office pods, battery charging pod and a mezzanine.
Staff accommodation was built external to the temperature controlled chambers, comprising of +12, and +1 degree temperatures and a frozen OTB chamber. A 14,876ft², a vehicle maintenance unit, technical services building and a recycling services unit.
Throughout this project VolkerFitzpatrick worked closely with Tesco to develop detailed value engineering alternatives to the specification including:
VolkerFitzpatrick also completed external site works including hard standings, asset store, car parking, statutory services, hard and soft landscaping and drainage.