Holt Fleet Bridge

Holt Fleet

Our team completed works to enable the lifting of a 7.5 tonne weight restriction imposed during the early part of 2009. This entailed concrete and parapet repairs, replacement of sandstone to the approach wing walls and painting of the entire structure.

Key Services Provided

  • Concrete repairs
  • Parapet repairs
  • Painting
  • Restricted access
  • Traffic management

Spanning two districts of Worcestershire, we worked with Heritage Inspectors from both Malvern and Wychavon to develop a suitable specification and approach to the works.

Working space within the bridge structure was extremely restricted, to the point where only the smaller members of our workforce were able to access the area. A specific work method and rescue procedure was implemented, with each operative being supervised by a second, and sometimes a third man to ensure safety within such a confined space.

Project sheets

Facts and figures

  • Client
    Worcestershire County Council
  • Value
    £1.1 million
  • Duration
    9 months
  • Project categories
    Civil engineering

Learn more about this project?

Contact marketing@volkerlaser.co.uk »

Related projects

All projects

Related News

More news

VolkerLaser wins British Safety Council International Safety Awards 2012

It is with great pleasure to inform you that VolkerLaser Ltd has received a Distinction level award through the British...

+