Flood and coastal protection

AMP6 water framework

United Utilities has appointed C 2 V+ a VolkerStevin and CH2M joint venture, as one of four Construction Delivery Partners...

Project details»

Ipswich tidal barrier gate

Ipswich has a long history of flooding both from high fluvial flows and surge tide effects, with more than 1,500 residential...

Project details»

Thames Tideway Tunnel (TTT)

VolkerStevin has been appointed by Thames Water to carry out enabling works, in advance construction of the Thames Tideway...

Project details»

River Don Stability Works

Doncaster

The right bank of the River Don between Mile Thorn Sidings and Long Sandal Lock on the north east outskirts of Doncaster has a...

Project details»

Kirkcaldy Sea Wall, Fife

Kirkcaldy

VolkerStevin is currently undertaking refurbishment and heightening works to the existing sea wall at Kirkcaldy to reduce...

Project details»
  • Vacancies

News alerts

For PL Portal Compensator please visit the specific company's website.
VolkerWessels UK Ltd. Registration no: 1179305. Registered Office: Hertford Road, Hoddesdon, Hertfordshire EN11 9BX. Registered in England.